Starting from change
Changes in product structure, material form and order rhythm will directly affect the design of the automation unit. Clarifying the product family, switching frequency and key differences before planning will help select reasonable automation boundaries.
Leave room for adjustments to the process
Decompose positioning, loading, vision and process execution into coordinated modules, leaving room for changeover, maintenance and subsequent expansion on the basis of stabilizing process requirements.
Sample inspection plan
By verifying the critical path with typical samples, problems with assembly tolerances, surface treatment, incoming material consistency and equipment accessibility can be discovered in advance, so that the plan is consistent with on-site requirements.

